Altrix roof erected using the DESSA beam support assembly, with a 36 degree pitch to allow for a reduction in the scaffold levels at either side of the build.
Facts & Figures
Date: | November 2016 |
Duration: | 8 months |
Customer: | Altrad Plettac Mefran |
Provision: | Supply |
System: | Altrix (APM exclusive design) |
Span: | 15m 36 degree Duopitch |
Length: | 20m (2.5m bays) |
Build Method: | Crane, to fixed roof support |