DESSA were engaged to design a scheme for the bridge refurbishment works. Careful planning was required to ensure the Plettac Futuro scaffold could be installed around the bridge members, whilst providing a clear run for the DESSA sysTRAX to operate.
Three roofs of 60m lengths were then lifted in modules, by crane onto the sysTRAX. This gave the user a combined 180m of coverage that could be moved as necessary along a 350m long bridge. DESSA 450 alloy beams were installed below for form a mobile working platform for access.
Date: | October 2019 |
Duration: | 1 year |
Customer: | TD-S |
Provision: | Design and Supply |
System: | UNI Roof, sysTRAX, 450 alloy series |
Span: | 14m |
Length: | 3x60m |
Build Method: | Craned onto sysTRAX |