X

When the staircase within DESSA head office was under repair, our team installed a 15 tread RANGER Stair unit from the warehouse floor to our mezzanine floor. This provided essential access to the warehouse to ensure operations continued uninterrupted. This was installed and secured in 5 minutes by two operatives.

Date: September 2020
Duration: 1 week
Customer: DESSA
Provision: Design and Supply
System: RANGER Stair
Variant: 15 tread