When the staircase within DESSA head office was under repair, our team installed a 15 tread RANGER Stair unit from the warehouse floor to our mezzanine floor. This provided essential access to the warehouse to ensure operations continued uninterrupted. This was installed and secured in 5 minutes by two operatives.
Date: | September 2020 |
Duration: | 1 week |
Customer: | DESSA |
Provision: | Design and Supply |
System: | RANGER Stair |
Variant: | 15 tread |