Crane built Altrix roof providing weather protection to the building below.
Facts & Figures
Date: | November 2016 |
Duration: | 12 months |
Customer: | Altrad Plettac Mefran |
Provision: | Supply |
System: | Altrix (APM exclusive design) |
Span: | 26m Duopitch |
Length: | 83m (2.5m bays) |
Build Method: | Crane, to fixed roof support |