This project required a temporary public access bridge over an existing roadway. DESSA designed the overall scheme to integrate the Asterix HD beams (complete with aluminium lacing and bracing elements) with a Plettac system scaffold. The Asterix HD beams were overlaid with timber battens and clad in plywood to support the public.
Facts & Figures
Date: | October 2018 |
Duration: | 12 months |
Customer: | TD-S |
Provision: | Design and Supply |
System: | Asterix HD |
Span: | 18m |